1. What is the use of item number in maintenance order?

2. What is refurbishment order? Explain the total cycle?

3. How to add the counter plan and strategy plan in a single maintenance plan?

4. How can we assign measuring points to a strategy plan like compressor running hrs?

5. What is a Milestone Confirmation?

6. What is Work Center Category?

7. How to set the deletion flag to Functional location and also want to know how to hide the flagged Functional location?

8. What is meant by single cycle plan? How it works?

 

 

1. What is the use of item number in maintenance order?

Item number refers to the number (not material number) to Identify the material component that is to be used for an operation in the maintenance order. It is generally given in increments of 0010.It is the first field in the Components tab of a maintenance order.

2. What is refurbishment order? Explain the total cycle?

Refurbishment order is used for upgradation of damaged / defective spare parts and are segregated as condition based . eg C1, C2 and C3

CYCLE: create refurbishment order­ withdrawal of spare parts from store­ refurbishment execution­ order completion confirmation­ refurbished parts back to store­ goods receipt for returning.

3. How to add the counter plan and strategy plan in a single maintenance plan?

Multiple counter plan and strategy plan cannot be added together, If u add counter plan with a strategy, counter plan will be taken into consideration ,strategy will not be considered.

4. How can we assign measuring points to a strategy plan like compressor running hrs?

Go to the change equipment transaction, then extra, then add or replace counters. Then select the desired counter by F4 help. You can’t directly add counters or measuring pts to a maintenance plan.You can do this for equipment ,FL and PRT only.

5. What is a Milestone Confirmation?

The milestone confirmation is a special form of confirmation, in which the confirmation of one operation causes other operations or sub operations to be automatically confirmed at the same time.

Milestones are operations that have the corresponding indicator in the control key.Operations can be defined as milestone operations in their control keys. If a milestone operation is confirmed, then previous operations are automatically confirmed.

6. What is Work Center Category?

Basically work center category decides the capacity (means ability to do work). The category defines the activity type for costing and scheduling the categories mainly we come across in the production are labour and machine. Hence to define labour cost, machine cost and setup cost we define work center category to create work center and we enter defaults therein. For a period of time if there are no much changes we generally prefer production line, and if thereare much changes in the production we prefer activity type for individual order which we call production order. By this you can understand cat type 001 for machine and cat type for labour.

Work center category used to define which screen selection & field selection for a particular work center.

7. How to set the deletion flag to Functional location and also want to know how to hide the flagged Functional location?

You can use transaction code IL02 to change functional location, highlight the respective functional location and go to edit at the top tool bar, there you select functions change and their you can click delete, to set a flag delete.

You cannot hide this functional location when you display IH01 , the functional location hierarchy is displayed but once you click it , the screen appears showing the
functional location is created with flag for deletion.

8. What is meant by single cycle plan? How it works?

Single cycle plan is may be performance based or time based but here it not required to maintain strategy. By entering main. Category we will create maintenance plan for particular object by using t code IP41.

 